About DOE Button Organization Button News Button Contact Us Button
Search


Entire Site
MA only
Link: Energy Home Page
Science and Technology Button Energy Sources Button Energy Efficiency Button The Environment Button Prices and Trends Button National Security Button Safety and Health Button
Office of the Chief Information Officer

Emergency Procedures

On this page is the collection of Emergency Procedures documents for the Department of Energy, Headquarters buildings, in the Washington, DC, metropolitan area.

  1. Emergency Procedures Pamphlets
  2. Building Diagrams and Assembly Areas
  3. Occupant Emergency Plans (OEP's)

All of these documents are only available to computers attached to the DOE Network.  They are for use only by DOE Headquarters employees.  Any computer not on the DOE Network will get an error message when trying to access one of the documents.

Headquarters Emergency Procedures Pamphlets

The Emergency Procedures Pamphlets can be obtained from the Safety and Health Office, Forrestal Room GE-112, 202-586-1005 or from Forrestal Secondary Distribution in Room GE-140.

These pamphlets can also be viewed and downloaded here.

The following are links to Acrobat files with the pamphlets for each building. If you click on a link you will view the Acrobat file. Or, you may right-click on the link and then select "Save Target As ..." (Internet Explorer) or "Save Link As ..." (Netscape Browsers) to download the file(s) directly to your disk.

Building Diagrams and Assembly Areas

Posted here, are the diagrams of Headquarters' buildings, and the Assembly Areas. If clicked, each of the links below will open up with the maps and diagrams. Or, you may right mouse click the links and then save the files to your disk.

The diagrams are generic floor plans that do not represent any one floor. These diagrams can be used for identifying your evacuation route and posting on the back of your door.

All questions go to 202-586-1005.

Building Diagrams
The following are graphic files that are easily viewed but may not print small details well.

  • Forrestal Diagram (pdf) DOE Internal Access Only
  • Germantown Diagram (pdf) DOE Internal Access Only
  • 950 L'Enfant Plaza Diagram - not yet available
  • 955 L'Enfant Plaza Diagram - not yet available
  • 270 Corporate Center Diagram - not yet available
  • Cloverleaf Center IV Diagram - not yet available

Assemby Areas
The following are graphic files that are easily viewed but may not print small details well.

  • Forrestal Assembly Areas (pdf) DOE Internal Access Only
  • Germantown Assembly Areas (pdf) DOE Internal Access Only
  • 950 L'Enfant Plaza Assembly Areas- not yet available
  • 955 L'Enfant Plaza Assembly Areas- not yet available
  • 270 Corporate Center Assembly Areas- not yet available
  • Cloverleaf Center IV Assembly Areas- not yet available

Print Quality Diagrams
The following links go to Acrobat files that contain both a generic building diagram and the designated assembly areas.  These diagrams are of print quality.

  • Forrestal Diagram and Assembly Areas (pdf) DOE Internal Access Only
  • Germantown Diagram and Assembly Areas (pdf) DOE Internal Access Only
  • 950 L'Enfant Plaza Diagram and Assembly Areas - not yet available
  • 955 L'Enfant Plaza Diagram and Assembly Areas - not yet available
  • 270 Corporate Center Diagram and Assembly Areas - not yet available
  • Cloverleaf Center IV Diagram and Assembly Areas - not yet available

Occupant Emergency Plans (OEP's)

The Occupant Emergency Plans (OEP's) provide the specific procedures to protect life and property in emergency situations. The DOE Office of Management, Office of Administration, has responsibility for implementing the overall program for the DOE Headquarters facilities. In leased facilities, the lead agency is responsible for coordinating the overall plan. Each Program Secretarial Office is responsible for the implementation of the detailed OEP requirements for the areas of the building that they occupy.

The General OEP provides the basic information, including duties and responsibilities, that are applicable to all buildings.

The building-specific OEP's contain the drawings, information, and team members specific to one building.


This is a good time to review steps you can take at the office and at home to prevent a fire incident, which include the following: 

Home:

  • Check and replace batteries in smoke detectors as necessary.
  • Service water heaters and furnaces annually.
  • Use only U/L rated electrical cords and replace those that are frayed.
  • Develop and rehearse periodically your home evacuation plan.
  • Do not overload household circuits.
  • Create a Grab-N-Go kit with important necessities

Office:

  • Review your site-specific emergency procedures booklet.
  • Know two separate ways to evacuate your assigned work areas.
  • Know where your assembly point is outside the building.
  • Know the location of your nearest fire extinguisher.
  • Know the emergency telephone numbers for your location.
  • Create a Grab-N-Go kit with important necessities.
  • Take a First Aid, CPR, and AED training class.
  • Get involved as a Warden or Monitor.
  • Let your supervisor or Safety and Health Representative know if you have a special need.
Link: The White House Link: USA.gov Link: E-gov Link: Information Quality (IQ) Link: Freedom of Information Act (FOIA)
U.S. Department of Energy | 1000 Independence Ave., SW | Washington, DC 20585
1-800-dial-DOE | f/202-586-4403